Natural gas installation is not just a matter of laying pipe — it is an engineering process that begins with an accurately drawn, approved project. A project that does not comply with Enerya's technical specification will be rejected at the gas activation stage, wasting both time and money. At Tesisat Antalya, we provide Enerya-compliant natural gas project design, technical drawing, and turnkey installation services across all Antalya districts. We manage every step from project drawing to gas activation on your behalf. Call us: +90 532 694 74 19
For properties connecting to the gas network for the first time or renewing existing installations, we prepare technical project drawings in Enerya format. The drawing covers the complete pipe route from the meter outlet to the boiler connection and cooker outlet, pipe diameter and length calculations, and gas pressure-drop verification. Once project approval is obtained, turnkey installation is completed. Project drawing and Enerya approval follow-up are included in our service.
For multi-storey apartment buildings and housing estates, a building-wide column installation project is critical. The main column route from basement to roof, distribution connections at each floor, meter cabinet location, and emergency shutoff valve positioning are drawn to Enerya technical specification. An incorrectly prepared column project affects all apartment connections; we work directly with building managers and construction firms to ensure coordination.
For hotel kitchens, restaurants, and catering facilities, we prepare industrial-scale gas installation projects. Total gas load from ovens, ranges, grills, fryers, and water heaters is calculated; main pipe diameter and pressure regulator values are determined. Emergency gas shutoff valve, automatic cut-off system, and gas detector connection points are included in the project scope.
Converting an apartment building from centralised heating to individual boilers involves significant technical and administrative processes. The suitability of the existing column installation for individual connection is assessed; separate meter connections, project drawings, and Enerya approval are prepared for each apartment. For buildings where multiple apartments convert simultaneously, we offer a group project organisation that reduces both cost and timeline.
For large villas in Döşemealtı and Konyaaltı, we prepare comprehensive projects covering multiple outlet points (boiler, kitchen cooker, outdoor barbecue, outbuildings). Long-run pipe diameter calculations, underground pipe section planning, and large-capacity boiler or heating system selection are all addressed at project stage.
After installation, the full system is pressure-tested at 1.5 times working pressure and held for a minimum of 30 minutes without any pressure drop. The result is recorded in an official tightness test certificate. At commissioning, the boiler is lit for the first time, system parameters are adjusted, and the user is briefed.